Internal waterproofing

Work on internal waterproofing held in rooms with high humidity and in areas of possible direct exposure to moisture.

The main purpose of waterproofing the inside - to prevent moisture in the concrete (stone, brick), the surface of the main structural elements.

In the absence of such water proofing, moisture can be adsorbed on porous surfaces, gradually penetrating to open the pores, resulting in saturation of the structures. Consequence of high humidity structural elements are the formation and development of fungal and other mikrobioniki that significantly impairs ecology of space. Also, over time, can develop the processes of reinforcement corrosion and other embedded metal items that will affect the decrease in reliability and service life of the facility as a whole.

There are two main methods of internal insulation:

  1. Waterproofing of concrete (stone) of the surfaces of cement materials
  2. Waterproofing of concrete (stone), the surface of polymer mastic materials.

Detailed descriptions of these technologies can be found in the relevant sections of the site.

The advantages of these technologies compared to traditional (and inexpensive application of roll-bituminous materials) are of a high and lasting quality, speedy delivery, and environmental friendliness. According to the technology is possible to apply the following materials:

Waterproofing cement materials

Manufacturer Recommended Reading
Neoteks SA (Greece) Neopress, Revineks
Description of work package Approximate cost, rubles. / M² Averaged temporal characteristics The average flow rate, kg / m² Optim. T-interview., °C
Viability, min Teh.pauza between the layers, min Tech. pause prior to commissioning
Priming coat 40,00 20-40 0,6-1,0 7 - 20
Two main layers 90,00 20-40 1,5-2,5 7 - 20

Waterproofing of polymeric materials

Manufacturer Recommended Reading
Neoteks SA (Greece) Neopruf, Betofiks Roofing
Description of work package Approximate cost, rubles. / M² Averaged temporal characteristics The average flow rate, kg / m² Optim. T-interview., ╟ C
Viability, min Tech. pause between the layers, min Tech. pause prior to commissioning
Priming the two layers 50,00 30-40 0,5-0,7 -20 - 30
Two main layers 90,00 30-40 0,7-1,3 -20 - 30

Work on waterproofing shall be conducted at the engineering support and on the basis of the project.